WelcomeTomoka River Bridge Project Home PageLink to other RS&H CS Construction ProjectsNew photos added 05/18/2001Newsletter added 08/07/2001
Description:This four million dollar project involves the complete removal of the northbound and southbound two lane eleven span 110 meter (360 feet) bridges across the Tomoka River in Ormond Beach, Florida. The bridges will be replaced utilizing seven span AASHTO Type II beams with a total span length of 107 meters and at a slightly higher grade profile. The roadway reconstruction will be approximately 540 meters (1770 feet) in length for both northbound and southbound roadways. During construction, traffic will be restricted to one lane in each direction and the northbound traffic diverted onto the southbound bridge. The northbound bridge will then be demolished and reconstructed to include related drainage structures and roadway paving. North and southbound traffic will then be switched to the new bridge and the southbound bridge will be demolished and reconstructed followed by the drainage structures and roadway paving.
This site designed and maintained by
in conjunction with
|