Welcome

Tomoka River Bridge Project Home Page

Link to other RS&H CS Construction Projects

New photos added  05/18/2001

Newsletter added 08/07/2001

 

wpe1B.jpg (24554 bytes)
Click on picture for larger version

Description:

This four million dollar project involves the complete removal of the northbound and southbound two lane eleven span 110 meter (360 feet) bridges across the Tomoka River in Ormond Beach, Florida. The bridges will be replaced utilizing seven span AASHTO Type II beams with a total span length of 107 meters and at a slightly higher grade profile. The roadway reconstruction will be approximately 540 meters (1770 feet) in length for both northbound and southbound roadways.  During construction, traffic will be restricted to one lane in each direction and the northbound traffic diverted onto the southbound bridge.  The northbound bridge will then be demolished and reconstructed to include related drainage structures and roadway paving.  North and southbound traffic will then be switched to the new bridge and the southbound bridge will be demolished and reconstructed followed by the drainage structures and roadway paving.

 

This site designed and maintained by

Bringing quality construction management to your job!
RS&H CONSTRUCTION SERVICES, INCORPORATED

in conjunction with

Click here to go the Bridge Construction and Engineering Home.

Hit Counter